On-Site Commissioning

“I’m lead-engineer, this is my job, it’s my responsibility”.

At Optima Control Solutions Ltd. our operational approach to engineering projects is to have the lead engineer take complete responsibility for a job from survey through to commissioning. We believe this approach provides the best-engineered system for our customers. So when our commissioning engineer, or the commissioning team arrives on site – the lead project engineer will be there. It’s their job, they have the intimate knowledge, they know the process and exactly what the customer wants; they will make sure the system performs – it’s their responsibility.

Safety on-site is also primary responsibility for us. On all our projects we provide a risk assessment and method statements for all activities. As commissioning engineers we recognise our obligations to our clients, their contractors, our contractors and ourselves. We work safely and responsibly.

Need more information? Browse various projects here. Our industry-specific pages also provide details about the control system projects we have completed over the years.

Recent Posts

Sustainable and Eco-Friendly Drive Technology from Optima

The innovative sinamics G220 variable frequency drive from Siemens not only helps reduce harmonics (Gary Wilcock) but is also a more sustainable drive choice. Let us explain.

The animation below shows the draft panel layouts for 8 drives using the G120 drives along with the required input and output reactors due to the long cable lengths involved for this installation. 

Shown on the right of the animation is the draft layout using the new G220 drives.

The new G220 drives, allow us to accommodate double the number of drives in one cabinet as no chokes are required.

SINAMICS G220 – the variable frequency drive for all industries

It has helped Optima Control Solutions Ltd make this a more sustainable design. 

Not only have we have reduced CO2 emissions in transit as the cabinet is lighter, we have also reduced the amount of minerals required to build by avoiding additional copper in the line chokes and steel in the chokes and cabinets.

The fusing for the other 8 drives has been moved to an adjacent cabinet where there are other drive sizes located. The control panel build is now underway. 

A big thanks to Ben Poole, too for his timely demonstration of these excellent drives. Sustainability CleanTech

 

  1. Continued Upgrade of Batch Plant Leave a Reply
  2. SINAMICS G Smart Access Module Leave a Reply
  3. Scalable motion control systems from Siemens and Optima Leave a Reply
  4. Efficient Motion Control ATEX Coating Leave a Reply
  5. Digital cloud-based asset monitoring is offered worldwide Leave a Reply
  6. Full Project Turnkey Solutions Leave a Reply
  7. Safety Scanner Issues and EN999 Leave a Reply
  8. Parker SSD Microtach Replacements Leave a Reply
  9. Accelerate your digital and sustainability transformation at Siemens Transform 2024 Leave a Reply